Start-up date | Introduction of equipment and the installation location |
---|---|
31.03.2004 - 20.05.2021 | Power Supplies BP2407 in the amount of 165 pcs. for mine electric locomotives lighting circuits. |
04.04.2008 - 12.09.2012 | Batching control equipment «AUD-Dnipro» (mine normal construction), mine them. Frunze, Yubileynaya mine. |
27.05.2009 - 20.05.2021 | Power supplies BPA1203 in the amount of 78 pcs. for mine electric locomotives radio stations. |
05.10.2009 - until now * | Signaling, centralization and blocking equipment «SZB-Dnipro», mine them. Frunze. |
28.05.2012 - until now * | Signaling, centralization and blocking equipment «SZB-Dnipro», Yubileynaya mine. |
09.09.2011 - 16.08.2019 | Loud-speaking dispatcher communication equipment «AGDS-Dnipro», mine them. Frunze, Yubileynaya mine. |
28.02.2013 - 20.05.2022 | Shaft signaling and communication equipment for the sinking lift «ASHSP-Dnipro», Yubileynaya mine. |
28.02.2013 - 20.05.2022 | Shaft communication and signaling equipment «ASSS-Dnipro» (mine normal construction). |
* - content of the equipment is constantly enlarging in line with the development of the horizon.