Start-up date | Introduction of equipment and the installation location |
---|---|
16.12.2003 - 02.04.2010 | Power Supplies BP2407 in the amount of 85 pcs. for mine electric locomotives lighting circuits. |
14.04.2005 - until now * | Signaling, centralization and blocking equipment «SZB-Dnipro». |
14.12.2010 - 26.12.2018 | Shaft communication and signaling equipment «ASSS-Dnipro» (mine normal construction) (13 sets). |
05.11.2014 | Loud-speaking dispatcher communication equipment «AGDS-Dnipro» (2 sets). |
04.12.2015 - 07.12.2021 | Shaft signaling and communication equipment «ASHS-Dnipro» (mine normal construction) for cage hoisting. |
08.12.2018 | Telemechanics system of mine underground substations «STM SHPP-Dnipro». |
* - content of the equipment is constantly enlarging in line with the development of the horizon.