PJSC «DTEK Pavlogradugol»
Start-up date |
Introduction of equipment and the installation location |
27.05.2010 - 16.06.2022 |
Shaft signaling and communication equipment «ASHS-Dnipro» (mining flameproof construction): skip lifting of Stepnaya mine and mine them. Geroyev Kosmosa; cage lifting of Samarskaya mine, mine them. Geroyev Kosmosa and Yubileynaya mine. All 7 sets. |
14.12.2010 - 16.06.2022 |
Shaft communication and signaling equipment «ASSS-Dnipro» (mining flameproof construction): Stepnaya mine, mine them.Geroyev Kosmosa, Samarskaya mine, Blagodatnaya mine, mine them. Stashkova, Dneprovskaya mine, Yubileynaya mine, Ternovskaya mine, Pavlogradskaya mine. All 38 sets. |
10.12.2013 - 03.12.2014 |
Batching control equipment «AUD-Dnipro», mine them. Geroyev Kosmosa. |