| Start-up date | Introduction of equipment and the installation location |
|---|---|
| 25.11.2010 | Shaft signaling and communication equipment «ASHS-Dnipro» (mining flameproof construction), rock hoist of mine №10 «Novovolynskaya». |
| 25.12.2015 | Level control equipment «AKU-Dnipro» (mining flameproof construction), rock hoist of mine №10 «Novovolynskaya». |